Projects

Payne Road Bridge

PROJECT REVIEWS

Project

1129 – Payne Road Bridge

Client

Brisbane City Council

Location

Payne Road, The Gap, Brisbane

Scope of Work

Conducted crack repair on the underside of a small road bridge on Payne Road. To limit site impact into the stream and environment, extensive ground sheeting was laid to ensure containment of the work site. Cleaning was also conducted throughout the day to further limit impact from the small working area on the scaffolding.

Crack Injection

Surface preparation was made to
manufacturer’s specifications to maximise the effectiveness of the repair. Tam Rez 210 Epoxy Crack Injection Resin was
then used to fill the surface cracks where the injection nipples were placed 200mm apart – the resin was again applied
to manufacturer’s specifications. With the resin applied, the surface was ground down to a smooth finish and two coats
of Sikagard 706 Thixo were applied as a protective coating.

Materials Used

Tam Rez 210 – 10 Linear Metres – Batch No. 130423 Sikagard
706 Thixo – 20L Applied – Batch No. 034737

Date

18/2/2014 – 6/3/2014

ABOUT

FRP Carbon is a unique specialist installer company of approved certified high quality and substitute of products carbon & glass products in South East Queensland Australia. We use only the best carbon laminate & glass fabric to do the job and achieve the structural integrity, quality, strength and speed of installation.

©2019 FRP & Carbon Solutions | Website Design & SEO by Digital Nomads HQ